collisionwork: (considers)

And for the second close entry in a row, another document created for the show in lieu of a post.

In this case, the To-Do List I created for the show (That's What We're Here For, remember?) this morning.  I randomly started spewing this out, but then started organizing it and so forth, which I hadn't expected to do.

Making this up actually calmed me down a lot, if this is everything I actually need to do . . .  hope I didn't forget something . . .

********************

TWWHF TO-DO LIST 6/15/06

 

-go to ATM at Duane Reade – get $20 to pay part of $48 for rehearsal space tonight (have rest of cash ready now)  (Thursday morning)

-get milk, bread, cereal – have some kind of actual breakfast (and other meals) apart from coffee and pizza (get Coffeemate as show prop at the same time, if you can)  remember you have a coupon for Duane Reade!  (Thursday morning)

-email The Brick people to confirm about tonight in the space after the festival shows  (Thursday morning)

-email cast about various matters (prop list, anyone feel like helping out as bodies during my dry tech or helping Berit build stuff?  can anyone print up a clean copy of the script for Berit for her tech notes?)  (Thursday morning)

-email Robert Honeywell about borrowing his red tie for myself  (Thursday morning)

-email Jason Robert Bell about borrowing his monocle for Fred (is this really right for FDR?  didn’t he wear pince-nez?  check Google Image Search)  (Thursday morning)

-email Julz about borrowing a lab coat  (Thursday morning)

-email Ken Friedman at WFMU about show, and its being inspired by sound pieces collected from the FMU website (and mostly from his posts)  (Thursday morning)

-email Maggie about picking up the special costumes she’s supplying  (Thursday morning)

-email James Bedell about the practical edison circuit (where's the edison to stage-pin connector that was on the backstage cable?)  (Thursday morning)

-load the cel numbers of cast members into your phone that you’ve forgotten to  (Thursday morning)

-download and edit the video segments (can we find the “Our Job in Japan” film itself, and use that instead of just the soundtrack recording we have?  would help the scene . . .  remember to find footage of American flag waving and a good A-Bomb explosion!)  (Thursday day)

-transcribe the “Our Job in Japan” section and make up script supplement – send to all cast members in that scene  (Thursday day)

-go through our storage cages with Berit, looking for props/supplies we may already have  (Thursday day)

-go over prop list with Berit – what’s missing?  what do we need to build?  what do we need to find or buy?  what can we cut? (is my prop Bible on the list?)  (Thursday day)

-go over with Berit what she still needs to build, and in what order she should prioritize them  (Thursday day)

-make up organized sound cues plan  (Thursday day)

-make up organized light cues plan  (Thursday day)

-make up organized video cues plan  (Thursday day)

-Excel spreadsheet of all cues, organized – go over script with Berit, put in cues in proper places  (Thursday day)

-consult with Berit on organization of sound cues onto CDs  (Thursday day or late night)

-rehearse the scenes as-barely-yet staged  (Thursday night)

-rehearse the musical numbers, repeatedly  (Thursday night)

-run through the show as much as possible  (Thursday night)

-overdub Gyda’s tap routine and Bryan’s whistle onto recording of “Dirty Little Jap”  (Thursday late night)

-figure out what to do to cover the scene change from Office to Telephone Room if you’re going to cut the puppet show  (Thursday late night)

-create sound cue CDs  (Thursday late night)

-create DVD of video segments  (Thursday late night)

-finalize my own costume  (Friday day)

-devil horns still needed for Bryan!  I’m sure Berit has this on the prop list, but in any case . . .  (Friday day)

-have backup plan for the staging of the “Telephone Room” scene in case the lighting/props cannot be made to work, or made to work properly in the time involved  (Friday day)

-write light cues, video cues, sound cues and levels in space (Friday day)

-rehearse Maggie’s and my dance sequence in the space with the set pieces (Friday afternoon)

-spend extra time when in space immediately on “Telephone Room” and “We Were Talkin” (Friday late night)

-work other problem areas as needed  (Friday late night)

-run through entire show, no stops, with full tech (Friday late night)

-get a good night’s sleep before opening  (Friday-Saturday)

-run show  (start Saturday night)

-find some time to do something for your 38th birthday, 6-16-06

-find some time to do something for Berit’s 30th birthday, 6-24-06

Profile

collisionwork: (Default)
collisionwork

June 2020

S M T W T F S
 123456
78910111213
1415 1617181920
21222324252627
282930    

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 1st, 2026 03:52 pm
Powered by Dreamwidth Studios